Skip to content

Burst pipe? No heat? Smell gas? We answer 24 hours a day. (647) 492-7575

Renovation

Bathrooms, kitchens and basements, plumbing included.

One crew does the plumbing, the gas and the finishing, so you are not coordinating three trades. Bathrooms, kitchens and basements.

Services

Renovation services

Pick a job

Choose one on the left and you get what it covers in plain English. If it is already leaking, flooding or you can smell gas, skip the reading and call.

Gut renovation in progress, framing and a ladder
Decide it now, not on demolition day

What costs more when it is found late

Nothing is broken on a renovation, so waiting costs you something different here. It is the things found after the quote is signed, when every option has already got more expensive.

  • Today

    A soft patch in the floor by the toilet

    Found on demolition day

    Subfloor replacement found on demolition day and priced as a change order, instead of sitting in the original quote.

  • Today

    Galvanised supply behind the tile

    Found on demolition day

    The same wall opened twice, and the second time is after the new tile is already on it.

  • Today

    A bath fan venting into the attic

    Found on demolition day

    Mould in the roof space, so a twenty minute reroute during the work becomes its own job with a roofer in it.

  • Today

    A vanity bought before anybody measured the rough in

    Found on demolition day

    A drain that has to move to fit it, which is the change order we are asked about more than any other.

Plan for these

What we usually find behind the tile

Nothing is broken yet on a renovation, so the useful list is different. These are the things that turn a straightforward quote into a change order, and all of them are cheaper to find before the work starts.

The floor feels soft or springy near the toilet
A slow flange leak has usually been working on the subfloor for years. It is a good thing to find now, while the floor is coming up anyway.
You want a wider vanity than the one that is there
The drain and supply may need moving. It is not a big job while the wall is open, and it is a very annoying one afterwards.
Galvanised or lead supply pipe behind the wall
The one moment it is cheap to replace is while the wall is already open. Tiling over it means opening the new tile later.
The bath fan vents into the attic
Common in older houses, and it quietly grows mould in the roof space. Rerouting it during the work costs very little.
You want a bathroom in a basement with no rough-in
Either the slab comes up to reach the drain, or an upflush system goes in. Both work, and the difference in cost and disruption is big enough to decide early.
The kitchen layout moves the sink or the range
Drain fall and gas line capacity decide what is possible. Worth checking before cabinets are ordered, not after.
Order of operations

What we would talk you out of

None of these are disasters. They are just the four decisions that most often cost people money on an otherwise well run job.

Do not buy the vanity before the rough-in is measured

Drain height and centre are what make a vanity fit. A beautiful unit that needs the drain moved 200mm is a change order, and it is always the wrong 200mm.

Do not tile over a floor that flexes

Tile does not bend. Grout cracks first, then the tiles, and the fix is pulling up the floor you just paid for.

Do not skip waterproofing behind the shower because it is going to be tiled

Tile and grout are not waterproof, they are water resistant. The membrane behind them is the thing keeping water out of the framing.

Do not leave the plumbing rough-in to the end

It is the one part that has to be right before anything covers it, and on a bathroom it dictates where everything else can go.

Real project ยท Before & after

One flooded basement, fully restored

Water-damaged and torn up to a finished, livable space. One crew handled the restoration, plumbing and finish. Drag any photo to compare.

Basement main living area, after
Basement main living area, before
BeforeAfter
Main living area
How a project runs

From first measure to handover

  1. Measure and scope

    We look at what is actually there, not just what you want. Drain positions, supply material, venting and floor condition, because those decide what the layout can be.

  2. A fixed quote you can read

    Line by line, with what is included and what is not. Fixture allowances are stated as allowances rather than buried, so you know exactly where your own choices change the number.

  3. Rough-in and inspection

    Plumbing, gas and venting go in and get signed off before anything closes up. This is the stage worth getting right, and the only one that cannot be revisited cheaply.

  4. Finish and hand over

    Tile, fixtures, trim and a working room at the end, cleaned up. Same crew throughout, so nothing waits on another trade's schedule.

No surprise invoices

What changes a renovation price

People assume fixtures drive the number. They are usually a small part of it. What actually moves a renovation quote is how much has to move.

  1. Whether drains move

    The single biggest driver. Keeping the toilet, sink and shower where they are is dramatically cheaper than relocating them, especially on a concrete floor.

  2. What is under the floor

    A subfloor that has to come up changes the schedule and the cost. It is also the thing most likely to be discovered rather than predicted.

  3. Fixture and tile choices

    The labour to fit a tap is the same whatever the tap costs, but small format tile, patterns and large slabs all take significantly longer to set.

  4. Permits and inspection

    Moving drains, altering structure or adding a bathroom usually means a permit. It is planned in from the quote rather than sprung on you.

  5. How much you want done at once

    Doing the ensuite at the same time as the main bath is not double the price. The setup, the protection and the trips are shared.

Asked on every call

Renovation questions

Swapping fixtures in the same positions usually does not. Moving drains, changing structure or adding a bathroom usually does. We will tell you which one your job is at the quote stage, and handle the permit where it is needed.

24/7 emergency response

Need renovation help now?

Emergency or planned job, you get an arrival window on the phone and a price before any work starts. Anywhere in the GTA, 24/7.

Tightening a fitting on a water heater
Call now: (647) 492-7575